Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

MAPUTO, 17-11-2026 | GOVERNMENT APPROVES THE DEVELOPMENT PLAN FOR LNG ROVUMA

Revised plan provides 121 billion dollars of financial gains for the State, 6 billion dollars for goods and services contracted to local companies, 25% of the gas produced for the domestic market, and more employment and training opportunities for Mozambicans.

The Government approved the Amendment to the Rovuma LNG Project Development Plan in Area 4 of the Rovuma Basin during the 33rd Ordinary Session of the Council of Ministers, held on 17 November 2026.

With an investment estimated at US$26 billion in the production phase, the revised plan amounts to 15,2 million tonnes of the planned annual capacity for liquefied natural gas (LNG). The new natural gas production and liquefaction model is based on the installation of electrical processing modules, which improves the use of available resources, reduces development costs and reduces emissions by about 40% compared to the initial plan approved in 2019.

"The approval of this Amendment is the result of a rigorous technical and economic evaluation, conducted by a Technical Team coordinated by the INP and composed of managers of the Ministries that oversee the areas of Oils, Finance, Labor and Earth and Environment, as well as the Tax Authority, the Bank of Mozambique and the Central Office of Reforms and Strategic Projects. This assessment ensures that the project serves the interests of the State and develops with the highest standards of safety and efficiency," said Nazi Engineer Bangalane, Chairman of the INP Board of Directors, Oil Regulatory Authority.

Over the 25 years of production, financial gains are expected for the government in the order of US$ 121 billion, as well as the provision of 25% of the total natural gas produced to the domestic market, as laid down in the Oil Act No 8/2026 of 3 November, for the industrialisation of our country. Another benefit to be highlighted is the allocation of the entire condensate to the National Hydrocarbon Company (ENH), which will be responsible for its marketing.

"The 25% guarantee of gas produced for the domestic market creates concrete conditions for the industrialization of our country and for the use of this resource for the benefit of Mozambicans," said Nazário Bangalane. The PCA of the Oil Regulatory Authority also added that the new concept, based on electrical modules, allows for increased production and, at the same time, reducing carbon emissions, which shows that it is possible to reconcile the development of the sector with environmental sustainability.

As far as local content is concerned, the new plan provides for the hiring of several goods and services to local companies, worth USD 6 billion, which will boost the value chain linked to the oil industry. In addition, a Nationalization and Succession Plan will be implemented that will increase the specialized Mozambican workforce over the years. During the construction and operation phases, Mozambican workers are expected to be hired, accompanied by training to take up progressively specialized functions.

The Rovuma LNG Project is an added value for maximising natural gas production in the country and will allow the continuous availability of this resource at national, regional and international level. It translates into more gains for the government in terms of revenue, and the strengthening of Mozambique in the map of regional leaders in the production and export of LNG.

The Rovuma LNG Project is developed by the partners of Area 4, operated by Mozambique Rovuma Venture (MRV), a Joint Venture between Eni S.p.A., ExxonMobil and CNPC, with 70% of participatory interest. They are also concessionaires to ENH, KOGAS and GALP, all with 10% of participatory interest.

As the Oil Regulatory Authority, the INP will ensure, within its competence, that the deadlines laid down in the Resolution approving the Development Plan Amendment as well as the technical, legal, environmental and regulatory requirements applicable to oil operations are met. It will also ensure compliance with the supply commitments to the domestic market and local content by exercising the necessary supervision for the sustainable recovery of Mozambique's oil resources.

Contacts for Information: 21248300; 839511000 | INP Headquarters: Rua dos Desportistas, No 259, Maputo | comunicacao@inp.gov.mz | Visit our networks: LinkedIn – Facebook and website www. inp.gov.mz

Recent News

INP DEFENDS MORE GAS TO IMPULSE NATIONAL INDUSTRY

On 19 October in Nacala-Porto, the Chairman of the Board of Directors of the INP, the Regulating Authority for Oil, Mr Bangalane, defended the extension of access of national companies to natural gas to enable new industrial projects and create jobs. During the panel on "The Role of National Institutions and Companies

Read more
EnglishenEnglishEnglish

AREA 1

Following the 2nd open competition for the granting of areas for the research and production of hydrocarbons, the companies Anadarko Mozambique Area 1 and the National Hydrocarbon Company were awarded Area 1 in offshore environment of the Rovuma Basin. The area is located in the northern part of Cabo Delgado Province, in shallow to very deep waters. The Hydrocarbon Research and Production Areas Grant Agreement (CCPP) was signed on 20 December 2006 and is effective as of 1 February 2007.

PROSPERITY DISCOVERING AREA

Median estimate of 43 tcf (cubic foot trillions) of gas.

4 Transzonal Reservoirs:

  • Upper North Oligocene;
  • Upper South Oligocene;
  • Oligocene Lower;
  • Upper Eocene;

TUBARAN DISCOVER AREA

Median estimate of 3.4 (cubic foot trillions) Tcf of natural gas.

THE AREA OF DISCOVERMENT

Median estimate of 8.4 Tcf (cubulated foot trillions) of natural gas

The Paleocene Reservoirs.

THE AREA OF DISCOVERMENT

Tigris Shark Discovery Area (1254 km2), has 3 reservoirs of the Cretaceous (K1,K2 and K3), the K2 being the best in Orca and Shark-Tigre and has a median estimate of 0.323 Tcf (cubic foot trillions) of natural gas.

UNKNOWN TUGRE AND ORCA (CRETACICO LEQUE 1, 2 E 3), ROVUMA OFFSHORE AREA 1

The complete technical evaluation of the potential of the Cretaceous in Area 1, between the Areas of Discovery Tubarão Tigre and Orca, determined that it contains small, discontinuous and low quality reservoirs, and this would probably present significant challenges in the supply of trade amounts of gas. Of the three reservoirs of Cretaceous (K1,K2 and K3) evaluated, the best is K2 in Orca and Shark-Tiger that has an average resource of 0.323 Tcf (cubic foot trillions) of natural gas.

FOUND OUT ORCA (LECK OF MEDIO PALEOCEN), ROVUMA OFFSHORE AREA 1

This discovery was made in Area 1 by Anadarko in 2013 through borehole Orca-1, whose reservoir is the age of the Middle Paleocene, was subsequently evaluated by the holes Manta-1, Orca-2, Orca-3 and Orca-4.

The discovery is located about 10 km from the coast line, 250 km from the city of Pemba. This reservoir is of Middle Paleocene age and is not shared. The average estimate of resources is about 8.4 Tcf (cubulated foot trillions) of natural gas in situ, according to estimates submitted by Total.

The reservoir in the Orca discovery lies at depths ranging from 4000 to 5000m below the mid sea level, and the water column from about 600m to 1200m. The extension is about 30 km.

UNCOVERED TUBARON (EOCENO), ROVUMA OFFSHORE AREA 1

This discovery was made by Anadarko in January 2011 through the Jaw-1 hole and evaluated by the Shark-2 hole (negative) in 2013. The discovery is located about 25 km from the coast line, 50 Km of the Northeast of the district of Mocímboa da Praia and 200 Km of the Northeast of Pemba City.

The reservoir is completely in Area 1. The average estimate of resources is about 3.4 tcf (cubic foot trillions) of gas in situ.

The reservoir is at a depth of 3500 to 4000 metres below the average sea level. The water column ranges from 800 to 1200 meters. The extent of the Shark discovery is about 20 km east-oriented.